Sportbad Friedrichshafen, Germany
Key Facts
布置方式:
The sports pool was inaugurated in June 2019 and enjoys ca. 1200 sqm of water. There is a 25 m swimming pool, a learning pool and a club pool with partially raisable floor, a course pool with fully raisable floor, a multi-function and young children's pool as well as a salt water pool in the external area. The waterproofing and tiling works was carried out by Fliesen Lepping GmbH & Co. KG. The tiling to the steam bath as well as in the textile aromatherapy steam bath was carried out by Hilpert GmbH & Co. KG.
建筑工程类型
新建工程
物件大小:
12500 m²
工作持续时间:
37 个月
产品
位置:
德国
/ Friedrichshafen
建筑师:
Behnisch Architekten
Rotebühlstraße 163A
70197 Stuttgart
涂敷商:
Fliesen Lepping GmbH & Co.KG
Max-Planck-Straße 2
48691 Vreden
涂敷商:
Hilpert GmbH & Co. KG
Karrystr. 23
36041 Fulda