Installation of tiles and slabs on chipboard and floorboards

Timber substrates must be clean, dry and load bearing. Chipboard must be laid bonded, screwed and glued. Faulty timber/board substrates are to be replaced, loose floor boards are to be professionally fixed (e.g. screws etc). Seal joints between boards, planks. Produce a gap between adjoining structures of min. 5 mm by inserting a self-adhesive edge insulation strip RD-SK50.
![]() |
PRIMING |
|
||||||||||||
![]() |
LEVELLING |
|
||||||||||||
![]() |
WATERPROOFING |
|
||||||||||||
![]() |
TILE INSTALLATION |
|
||||||||||||
![]() |
GROUTING |
|